- Disassembly of the 1000kVA Transformer for the modification of the MT Busbar.
- Installation of a 1250kVA Transformer on loan.
- Replacement of the fixed MT Busbar with the detachable MT Busbar of the 1000kVA Transformer at the SACEM factory.
- Reassembly of the 1000kVA Transformer.
- Supply and installation of 50mm² MT Cable.
- Supply and installation of detachable 50mm² Busbars.
- Testing and commissioning of the installation
Year : 2020
Filed of work : Energy Production and Distribution
Client : Clarke Energy
Final client : Gias industries
Electrical Installation and Commissioning of a 1.2 MW Cogeneration Plant with
Jenbacher JMS 416 Engine - 400 VAC - 1203 kW:
- Mounting and connection of 12 MT 30kV Medium Voltage Cells.
- Mounting and connection of the A1 control cabinet.
- Mounting and connection of the Auxiliary cabinets.
- Mounting and connection of a 2000kVA Step-up Transformer.
- Mounting and connection of a 630kVA Auxiliary Transformer.
- Supply and installation of a fire detection system.
- Supply and installation of various cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Achievements in 2019
- Disassembly of All Equipment from the Aerial 25kV Transformer Substation at Marsa Chebba Fishery Port
- Transport of all Substation Equipment (from Marsa Chebba Fishery Port to Magazin du Port La Goulette).
- Adjustment and implementation of the 36kV Intersec.
Achievements in 2019
- Supply and Installation of an Aerial Surge Arrester for the 250KVA/30KV HT/LT Substation at Ghar El Melh Fishery Port.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Achievements in 2016
Entretien, changement et mise en service de l’éclairage du tour Préchauffage et Tour Ensilage
Achievements in 2018
Fourniture, Installation et mise en service d’un système de sécurité Incendie (une centrale incendie conventionnel à afficheur LCD extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs manuels, 03 sirènes conventionnelles combinée.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.