Filed of work : Energy Production and Distribution
Location : Tunis
Electrical Installation and Commissioning of a 3.5 MW Tri-Generation Plant with
Jenbacher JMS 616 Engine - 11kV - 2679 kW:
- Mounting and connection of 8 MT 30kV cells.
- Mounting and connection of the GENCB cabinet.
- Mounting and connection of the A1 control cabinet.
- Mounting and connection of the Auxiliary cabinets.
- Mounting and connection of 3500kVA Step-up Transformer.
- Supply and installation of a fire detection system.
- Supply and installation of various cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Achievements in 2016
Entretien, changement et mise en service de l’éclairage du tour Préchauffage et Tour Ensilage
Achievements in 2018
Fourniture, Installation et mise en service d’un système de sécurité Incendie (une centrale incendie conventionnel à afficheur LCD extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs manuels, 03 sirènes conventionnelles combinée.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.