Field of work : Energy Production and Distribution
Location : Tunis
Electrical installation and commissioning works for a 4 MW Cogeneration Plant, featuring a Jenbacher JMS 612 J111 engine - 400 VAC - 2004 KW, including:
- Modification of the 30Kv Medium Voltage (MT) panel.
- Mounting and connection of the GENCB cabinet.
- Installation and connection of 2 A1 control panels.
- Mounting and connection of 02 Auxiliary panels.
- Installation and connection of a Common Auxiliaries control panel.
- Installation and connection of a 2x3000Kva step-up transformer.
- Installation and connection of 2 Auxiliaries transformers with a capacity of 200Kva each.
- Supply and installation of various cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Year : 2021
Client : L’EPI D’OR
Field of work : Energy Production and Distribution
Location : Tunis
Electrical Installation and Commissioning Work including:
- Supply and installation of a MICOM P127 relay.
- Supply and installation of a 24Vdc 20A-28Ah charger cabinet.
- Installation of 50mm² Medium Voltage cables.
- Installation of 300mm² Low Voltage cables.
- Installation of fiber optic cable.
- Installation of control cables of various sections.
- Supply and installation of 50mm² Medium Voltage plug-in terminals.
- Supply and installation of various cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Achievements in 2016
Entretien, changement et mise en service de l’éclairage du tour Préchauffage et Tour Ensilage
Achievements in 2018
Fourniture, Installation et mise en service d’un système de sécurité Incendie (une centrale incendie conventionnel à afficheur LCD extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs manuels, 03 sirènes conventionnelles combinée.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.