Client : AGENCE DES PORTS ET DES INSTALLATIONS DE PECHE
Filed of work : Transformer Substations
Location : Tunis
- Disassembly of All Equipment from the Aerial 25kV Transformer Substation at Marsa Chebba Fishery Port
- Transport of all Substation Equipment (from Marsa Chebba Fishery Port to Magazin du Port La Goulette).
Year : 2019
- Supply and Installation of an Aerial Surge Arrester for the 250KVA/30KV HT/LT Substation at Ghar El Melh Fishery Port.
Achievements in 2019
- Disassembly of All Equipment from the Aerial 25kV Transformer Substation at Marsa Chebba Fishery Port
- Transport of all Substation Equipment (from Marsa Chebba Fishery Port to Magazin du Port La Goulette).
- Adjustment and implementation of the 36kV Intersec.
Achievements in 2019
- Supply and Installation of an Aerial Surge Arrester for the 250KVA/30KV HT/LT Substation at Ghar El Melh Fishery Port.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Achievements in 2016
Entretien, changement et mise en service de l’éclairage du tour Préchauffage et Tour Ensilage
Achievements in 2018
Fourniture, Installation et mise en service d’un système de sécurité Incendie (une centrale incendie conventionnel à afficheur LCD extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs manuels, 03 sirènes conventionnelles combinée.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.