Secteur d’ activité : Production et distribution d’énergie
Location : Tunis
- Electrical Installation and Commissioning of a 4.5 MW Cogeneration Plant with
Jenbacher JMS 620 Engine - 11kV 3300 kW :
- Mounting and connection of 05 30kV MT Cells.
- Mounting and connection of the A1 control cabinet.
- Mounting and connection of the Auxiliary cabinets.
- Mounting and connection of 4500kVA Step-up Transformer.
- Supply and installation of fire detection system.
- Supply and installation of various cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Achievements in 2018
Fourniture et montage des serrures anti paniques pour les salles électriques.
Achievements in 2018
Fourniture et montage des serrures anti paniques pour les salles électriques.
Achievements in 2016
Entretien, changement et mise en service de l’éclairage du tour Préchauffage et Tour Ensilage
Achievements in 2018
Fourniture, Installation et mise en service d’un système de sécurité Incendie (une centrale incendie conventionnel à afficheur LCD extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs manuels, 03 sirènes conventionnelles combinée.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.