Electrical Installation and Commissioning Work including:
-04 Postes Cabines – Sous station 2500Kva.
- Assembly and connection of 08 Medium Voltage Cells 30Kv.
- Assembly and connection of 04 2500 Kva Boost Transformers.
- Assembly and connection of 04 400V/400V Isolation Transformers.
- Preparation of cable ends for 240mm² MT cables.
- Preparation of cable ends for 50mm² MT cables.
- Installation and connection of 04 TGPV panels 4000A.
- Installation and connection of 04 Auxiliary TGBT panels.
- Assembly and connection of a 4000A Busbar Duct.
- Supply and installation of the complete grounding for 04 Cabins.
- Supply and installation of various power cable sections.
- Supply and installation of various control cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Achievements in 2021
Electrical Installation and Commissioning Work including:
- Mounting and connection of 5 MT 30kV cells.
- Modification of the 36kV MT panel.
- Replacement of MT cables including the preparation of removable terminals
for 3 transformers of 3000Kva each.
- Preparation of cable ends for 240mm² MT cables.
- Installation and connection of STEG/Client meters.
- Preparation of cable ends for 240mm² MT cables.
- Preparation of cable ends for 50mm² MT cables.
- Installation and connection of a 2000A TGPV cabinet.
- Construction of an entrance duct, PDL.
- Supply and installation of cable pulling chambers.
- Supply and installation of complete grounding.
- Supply and installation of various power cable sections.
- Supply and installation of various control cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Achievements in 2019
- Disassembly of All Equipment from the Aerial 25kV Transformer Substation at Marsa Chebba Fishery Port
- Transport of all Substation Equipment (from Marsa Chebba Fishery Port to Magazin du Port La Goulette).
- Adjustment and implementation of the 36kV Intersec.
Achievements in 2019
- Supply and Installation of an Aerial Surge Arrester for the 250KVA/30KV HT/LT Substation at Ghar El Melh Fishery Port.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Achievements in 2016
Entretien, changement et mise en service de l’éclairage du tour Préchauffage et Tour Ensilage
Achievements in 2018
Fourniture, Installation et mise en service d’un système de sécurité Incendie (une centrale incendie conventionnel à afficheur LCD extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs manuels, 03 sirènes conventionnelles combinée.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.