- Mounting of instruments including tubing connections.
- Testing and commissioning of the installation.
Achievements in 2021
Electrical Installation and Commissioning Work including:
- Mounting and connection of 5 MT 30kV cells.
- Modification of the 36kV MT panel.
- Replacement of MT cables including the preparation of removable terminals
for 3 transformers of 3000Kva each.
- Preparation of cable ends for 240mm² MT cables.
- Installation and connection of STEG/Client meters.
- Preparation of cable ends for 240mm² MT cables.
- Preparation of cable ends for 50mm² MT cables.
- Installation and connection of a 2000A TGPV cabinet.
- Construction of an entrance duct, PDL.
- Supply and installation of cable pulling chambers.
- Supply and installation of complete grounding.
- Supply and installation of various power cable sections.
- Supply and installation of various control cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
Achievements in 2019
- Disassembly of All Equipment from the Aerial 25kV Transformer Substation at Marsa Chebba Fishery Port
- Transport of all Substation Equipment (from Marsa Chebba Fishery Port to Magazin du Port La Goulette).
- Adjustment and implementation of the 36kV Intersec.
Achievements in 2019
- Supply and Installation of an Aerial Surge Arrester for the 250KVA/30KV HT/LT Substation at Ghar El Melh Fishery Port.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.