Electrical Installation and Commissioning of 5.5kV MT Cells including :
- Assembly of 10 5.5kV MT Cells at the Power Plant.
- Supply and installation of various cable sections.
- Supply and installation of different types of cable pathways.
- Supply and installation of different mounting accessories and connections.
- Testing and commissioning of the installation.
- Removal of the old 400A MCC panel. - Mounting of a new 400A MCC panel. - Conducting tests and commissioning to ensure the functionality of the newly installed equipment.
Year : 2022
Client : STIR
Filed of work : Petrochemicals
Location : Bizerte
Electrical installation and commissioning works for the Low Voltage (BT) panels including:
- Dismantling of the existing LV Main Distribution Board (TGBT) in the STIR Central.
- Dismantling of MCC01, MCC02, MCC03, MCC04.
- Dismantling of the Synoptic Panel.
- Dismantling of the Lighting Panel.
- Dismantling of various distribution panels.
- Assembly of a new 2500A TGBT.
- Assembly of new MCC01, MCC02, MCC03, MCC04 panels.
- Assembly of a new Lighting Panel.
- Assembly of a new Synoptic Panel.
- Assembly of a new Instrumentation Panel.
- Routing and connections of various cable sections.
- Supply and installation of various types of LV cable joints.
- Supply and installation of different types of cable pathways.
- Supply and installation of grounding for the technical room.
- Construction of a new cable passage channel.
- Supply and installation of fire detection system.
- Testing and commissioning of the system.
Achievements in 2016
Entretien, changement et mise en service de l’éclairage du tour Préchauffage et Tour Ensilage
Achievements in 2018
Fourniture, Installation et mise en service d’un système de sécurité Incendie (une centrale incendie conventionnel à afficheur LCD extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs manuels, 03 sirènes conventionnelles combinée.
Achievements in 2019
Démontage et montage de poteau FRF y compris exécution d'un massif en béton
Travaux d’entretien ligne aérienne 30KV
Client : CAT COLACEM
Pays: Tunisie
Réalisations:
– Entretien, changement et mise en service de l’éclairage du tour
Préchauffage et Tour Ensilage
– Fourniture, Installation et mise en service d’un système de sécurité
Incendie (une centrale incendie conventionnel à afficheur LCD
extensible à 20 zones, 14 détecteurs de fumé, 03 déclencheurs
manuels, 03 sirènes conventionnelles combinée.